Construction Updates

Posted on: April 5, 2019

Commuter Lot 1 Construction Update - April 5, 2019

4-5-2019 - Lot 1 Photo 3 Resized for Trending

Work Completed this Week

  • Installed electrical conduit, bollard foundations and light pole foundations.
  • Installed wire span poles and foundations.
  • Installed storm sewer and open manhole connections to the rain garden.
  • Removed existing drainage structures.

Upcoming Work Planned Next Week

  • Install stone subgrade for parking lot base.
  • Install observation wells.
  • Install concrete curb.
  • Grade rain garden with stone and topsoil.