News Flash Home
The original item was published from 3/22/2017 9:58:00 AM to 4/9/2017 12:10:01 AM.

News Flash

E-Flash

Posted on: March 22, 2017

[ARCHIVED] Woodside Road Construction Map

Road-closed-signs-detour-traffic-temporary

Woodside Road Cross Walk Signal Modifications and Relocation


The Village of Riverside is pleased to announce cross walk signal modifications, ADA sidewalk ramp improvements, and a cross walk relocation on Woodside Road in the vicinity of Central Elementary and Hauser Junior High Schools beginning the week of March 27th.  See the map here.


Scope of Work

The mid-block cross walk leading to the entrance of Central Elementary School will be reconfigured slightly to the north.  This will move pedestrians out of the driveway at 54 Woodside Road and into a new ADA accessible ramp in the parkway.  Additionally, the existing antiquated signals and signal equipment will be replaced with up to date signals, signal equipment, and electrical service and will be reinstalled at new locations corresponding with the new crosswalk location. 


The intersection of Woodside Road with Park Place and Kimbark Road will also see modifications that include constructing new sidewalk ramps that are ADA compliant as well as replacing the six (6) existing pedestrian traffic signals with countdown type pedestrian signals and new push buttons and push button signs.  New sidewalk will be also be installed.  This will ensure all pedestrian push buttons are accessible.  Lastly, the existing incandescent vehicular traffic signal heads will be replaced with LED traffic signal heads to improve visibility of the traffic signal heads and reduce overall energy consumption.


Construction Schedule

Work will be completed between March 27th and April 1st.  Parking will be restricted (as posted) and the crosswalks will be closed during this time.  Work is anticipated to be completed prior to school re-opening on April 3rd. Please use caution when driving through the area. 


Questions or Concerns

The Village of Riverside is aware of the disruption and inconvenience that will be caused and appreciates your patience and cooperation during this construction project.  If you have any questions or concerns, please feel free to contact the Village Engineer, Orion Galey, at 847-833-0210.

Map of Construction Zone
Facebook Twitter Email

Other News in E-Flash

Santas Mailbox

Santa's Mailbox is Back!

Posted on: November 22, 2023
Fall Leaves

Leave the Leaves this Fall

Posted on: November 24, 2023
Shot to a sewer at the edge of sidewalk

Sewer Repairs Rescheduled to Tomorrow

Posted on: November 21, 2023
Riverside Logo framed square standard

Village's Tax Levy

Posted on: November 11, 2023
Credit Rating Graphic_resized

Village's AA+ Credit Rating Reaffirmed

Posted on: November 3, 2023
Close up back side of new silver car parking on the asphalt road

Vehicle Stickers and Pet Tags Reminder

Posted on: October 27, 2023
Halloween tower

Fall/Winter Brochure Available Now!

Posted on: September 25, 2023
Road closed signs detour traffic

Road Projects: Frequently Asked Questions

Posted on: September 6, 2023
no-soliciting-traffic-street-sign

Door to Door Solicitation List

Posted on: July 15, 2023